V-Infrastructure:

a. Details of land & building at the Institute :

(Note:-All Dimensions on the Drawings to be  prepared by registered Architect should be in meter)

 

1.

Total accommodation (sq. meters) required as per NCVT norms for the whole Institute (Covered area)

:

1800.00 Sq.m

 

2.

Actual accommodation (covered area) available (Sq. Meters)

:

2000.00 Sqm

 

3.

Total land area provided for the Institute     

 

05 Bigha

 

4.

Whether own or rented building  (enclose proof of ownership/ lease deed/rent agreement)                                                         

:

Own. Building

 

5.

Date of occupation

:

07-04-1995

 

6.

Duration of Lease / rent agreement.

:

NA

 

7.

Date of expiry of lease/rent agreement:

:

NA

 

8.

Whether attested copy of site plan and lay-out of the entire institute attached

:

Yes attached

 

9.

Name and registration no. of the Architect who prepared & signed on the layout

:

MR. GHANSHYAM MEENA REG.NO.  69/2005

 

 

10.

Area available in the institute for Office & Other facilities :

 

Description

Area Required as per NCVT Norms (sqm)

Area available in the Institute (sqm.)

Remarks (mention shortage if any)

 

Principal’s Chamber

20 Sqm

22.36 Sqm

Nil

 

Office

20 Sqm

22.36 Sqm

Nil

 

Staff Room

20 Sqm

29.67 Sqm

Nil

 

Library

40sqm

39.21 sqm

Nil

 

Dispensary

15sqm

21.93 Sqm

Nil

 

IT Lab

25sqm

40.08 Sqm

Nil

 

Engineering Drawing Hall

50sqm

       103.84Sqm

Nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Play Ground & Sports facilities (Indoor & Outdoor)

Available

500sqm

List of the Sports items available to be verified separately.

 

 

 

 

 

 

Area available in the institute for Workshops & Class rooms :

 

Name of the Trade

Maximum no. of units in one shift only

WORKSHOP

CLASS ROOMS

 

Required as per NCVT norms (Sq.M)

Actually available (Sq.M)

Shortage (If any)

Required as per NCVT norms (Sq.M)

Actually available (Sq.M)

Shortage

(If any)

 

Electrician

01

98.00

103.00Sqm

Nil

25.00

28.08

Nil

 

Wireman

01

88.00

89.00 Sqm

Nil

25.00

28.08

Nil

 

Mechanic Motor Vehical

01

210.00

243.00 Sqm

Nil

25.00

28.08

Nil

 

Fiiter

01

88.00

88.00 Sqm

Nil

25.00

28.08

Nil

 

Copa

01

70.00

70.00 Sqm

Nil

25.00

28.08

Nil

 

 

 

 

 
                           

 

Enclosures: -        1. Copy of the Rent Deed, Lease Deed attested / notarized.

               2. Copy of the Building Layout duly attested by the Architect with registration No.

               3. Site Map of the institute showing some landmark nearby.

               4. If drawing is not to scale, not prepared by registered architect, not readable, dimensions not

                              mentioned, do not recommend affiliation.

 

 

 

 

b. POWER SUPPLY :

(Note: Electrical Connection should be in the name of the ITI/Management/Owner of premises)

 

1.

Electrical Connection issued in the name of

SUPPRENTENTENT ITI AKLERA

2.

Electrical Connection issuing authority

JVVNL

3.

Date of connection

2007

4.

Whether three phase connection

YES

5.

K No. of the Connection

210641001410

6.

Meter Seal No.

3108860

7.

Whether Diesel Generator Set Available?

If Yes, its capacity,

Diesel Consumption and Payment

-

8.

Trade (Existing)

Maximum no. of units

 in one shift

Power supply required as per norms in KW

1

Electrician

2

5.2

5.0

4.8

 

3.51

2

Wireman

2

3

Mechanic Motor Vehical

2

 

Trade (New)

 

1

Fitter

2

2

COPA

2

3.45

 

Total electrical Load

21.95 KW

Power supply available in the Institute in KW

39.00 KW

 

(Note: The energy supplied by DG set is to be measured by installing Digital/Electronic meter at suitable location. This energy meter is to be which is to be sealed by the State Directorate Officers during preliminary inspection to avoid any tempering).

Enclosures :

(i)  For existing institutes: Electricity bill indicating connected load is required to be produced (details of existing trades, units should also form part of the inspection report to assess the required electrical load).

(ii)  For new institutes : Meter sealing report indicating sanctioned load or if meter sealing report does not have sanctioned load, copy of the sanctioned load, proof of payment of dues for the same along with meter sealing report should be produced/submitted.

(iii) Where the Institute is in the rented/leased building, the electric connection should be in the name of the owner of the institute/management and the mutual agreement between landlord and the Institute/Management/Society as the case may be, should be produced along with the current bill.

(iv)  Declaration by the owner of the Institute that the sanctioned load is for ITI only / shared with any other Institute.