V-Infrastructure:a. Details of land & building at the Institute :(Note:-All Dimensions on the Drawings to be prepared by registered Architect should be in meter)
Enclosures: - 1. Copy of the Rent Deed, Lease Deed attested / notarized. 2. Copy of the Building Layout duly attested by the Architect with registration No. 3. Site Map of the institute showing some landmark nearby. 4. If drawing is not to scale, not prepared by registered architect, not readable, dimensions not mentioned, do not recommend affiliation.
|
b. POWER SUPPLY :
(Note: Electrical Connection should be in the name of the ITI/Management/Owner of premises)
1. |
Electrical Connection issued in the name of |
SUPPRENTENTENT ITI AKLERA |
|
2. |
Electrical Connection issuing authority |
JVVNL |
|
3. |
Date of connection |
2007 |
|
4. |
Whether three phase connection |
YES |
|
5. |
K No. of the Connection |
210641001410 |
|
6. |
Meter Seal No. |
3108860 |
|
7. |
Whether Diesel Generator Set Available? If Yes, its capacity, Diesel Consumption and Payment |
- |
|
8. |
Trade (Existing) |
Maximum no. of units in one shift |
Power supply required as per norms in KW |
1 |
Electrician |
2 |
5.2 5.0 4.8
3.51 |
2 |
Wireman |
2 |
|
3 |
Mechanic Motor Vehical |
2 |
|
|
Trade (New) |
|
|
1 |
Fitter |
2 |
|
2 |
COPA |
2 |
3.45 |
|
Total electrical Load |
21.95 KW |
|
Power supply available in the Institute in KW |
39.00 KW |
(Note: The energy supplied by DG set is to be measured by installing Digital/Electronic meter at suitable location. This energy meter is to be which is to be sealed by the State Directorate Officers during preliminary inspection to avoid any tempering).
Enclosures :
(i) For existing institutes: Electricity bill indicating connected load is required to be produced (details of existing trades, units should also form part of the inspection report to assess the required electrical load).
(ii) For new institutes : Meter sealing report indicating sanctioned load or if meter sealing report does not have sanctioned load, copy of the sanctioned load, proof of payment of dues for the same along with meter sealing report should be produced/submitted.
(iii) Where the Institute is in the rented/leased building, the electric connection should be in the name of the owner of the institute/management and the mutual agreement between landlord and the Institute/Management/Society as the case may be, should be produced along with the current bill.
(iv) Declaration by the owner of the Institute that the sanctioned load is for ITI only / shared with any other Institute.